VerWatch vs updating Craft CMS by hand
Checked 15 November 2026
Most Craft sites are still updated by hand: someone pulls the repository, runs craft update all or clicks Update All in the control panel, checks the site, commits composer.json, composer.lock and config/project/, and deploys. It costs nothing but time, and you see every change as it happens. The trouble is that the steps are the same on every site, so with a dozen or more sites the ones nobody gets round to fall behind.
VerWatch runs those same steps for you on a schedule. It updates Craft and its plugins through Composer inside their current major versions, runs craft up so the migrations and project config changes land in the pull request, and opens pull requests for staging and production. You still test and merge, so the part you hand over is the part that is identical on every site.
By Chris Rowe, who builds VerWatch and has been building Craft sites since it was called Blocks.
At a glance
| Question | Updating by hand | VerWatch |
|---|---|---|
| Price | Free, apart from your time | Free while in beta |
| Who starts it | Whoever remembers, one site at a time | A schedule for each project, or one shared across a client's projects |
| Where it runs | Your machine, against your local copy of the site | An isolated container with a fresh install of your project from its own project config |
| Migrations and project config | craft update runs the migrations, and you commit the YAML |
craft up runs, and the YAML is in the pull request with a note of where each change came from |
| Major versions | craft update installs the latest version unless you pass --minor-only or --patch-only |
Every package stays on the major version it's on |
| Expired licences | Craft won't update expired packages, and you find out site by site | Checked for every site with the renewal cost, and held back |
| Staging and production | You push to each branch yourself | One run, one changeset, a pull request for each branch |
| Security fixes | However the news reaches you | Advisories marked on each project, and an email to the team for critical fixes |
| Testing | With your own content, before you commit | On staging, once the staging pull request is merged |
What a manual update involves
Craft's docs set out the routine. Read the changelogs and any upgrade guides first, and apply updates in development rather than on the live site: "We generally do not recommend applying updates in a non-development environment." Run craft update all, which asks whether to back up the database and applies the migrations once the update is done, or use the Updates utility in the control panel. Then commit composer.json, composer.lock and config/project/, and deploy, where Craft wants composer install and craft up to run every time.
None of that is hard, and for one site it's a short job. The cost is that it's the same job on every site, and each one needs someone with the repository checked out and a local copy of the site that still boots, which for a site nobody has touched in six months is often the slowest part.
Where sites fall behind
When we counted on 15 November 2026, 1,936 of the 4,255 installed packages across the Craft projects VerWatch tracks (45%) had a newer release inside their current major version, and 495 had an open security advisory. Nothing about that is broken, but every skipped release makes the next update bigger, and a security fix is much easier to ship in a hurry when the site is one patch release behind rather than fifteen.
Licences add to it. Craft's docs say the updater "will not update expired packages" and suggest running updates often to make the most of a licence while it's current. On a manual update you usually learn a plugin's licence has run out when craft update skips it. VerWatch asks Craft's update API about each plugin with the licence keys in your project config, the same request your site makes, and shows which licences have expired across every site and what renewal costs. On the day we counted there were 341 plugin installs on an expired licence.
What VerWatch does with the same steps
Each run clones the branch into a container, installs Craft from your project's own config with a database, and updates through Composer the way the Craft updater does, keeping every package on its current major and checking each release against the Craft version the site runs. When composer.json has no PHP platform setting, it resolves against the lowest PHP your current lock file already needs, so a dependency can't move to a release your server can't run.
Then it runs craft up and commits composer.json, composer.lock and the project config Craft wrote, with a report naming the migration and changelog entry behind each project config change. It opens a pull request for staging and one for production with the same changeset, merges the staging one by default so your host deploys it for testing, and leaves production for you. When one plugin needs updating everywhere, such as after a security fix, you can search for it and update the sites you pick in one go.
What stays with you
VerWatch installs your project from its config, not from your content, so it can tell you the update installs and migrates cleanly but not that your templates still look right. Testing on staging is still your job, which is why a run merges to staging and stops there by default.
Major upgrades stay with you too. Moving a site from Craft 4 to 5, or a plugin to its next major, means working through an upgrade guide, and VerWatch won't do it for you. It does show which packages have a newer major out, so you can plan those upgrades: across the projects we track that was 432 installed packages, about one in ten.
Which to pick
Keep updating by hand if
- You look after a handful of sites and already update them every month or so.
- You're in the middle of a major upgrade, such as Craft 4 to 5, which needs a person working through the upgrade guide either way.
- Your repositories aren't on GitHub, which VerWatch needs.
Pick VerWatch if
- You look after more Craft sites than you get round to updating each month.
- You want updates to arrive on a schedule as pull requests, with migrations run and project config committed.
- You want expired licences, security fixes and held-back plugins for every site in one place.
Questions
Should I update Craft from the control panel on the live site?
Craft's docs advise against it: they generally don't recommend applying updates outside development. Update in development, commit composer.json, composer.lock and config/project, then deploy with composer install and craft up. VerWatch follows the same path, updating in a container and deploying when you merge.
Does craft update run migrations?
Yes. After an update from the command line Craft applies the migrations, and it offers to back up the database first. The --backup and --migrate options control both.
Why did craft update skip one of my plugins?
Usually because its licence has expired: Craft won't update a plugin beyond what its licence allows. The --with-expired option overrides that, and VerWatch shows which licences have run out on every site.
Do I still need to test updates if I use VerWatch?
Yes. VerWatch checks that the update installs and migrates on a fresh install of your project, then merges it to staging so you can check the site with your real content before you merge production.
Sources
What this page says about updating by hand comes from Craft's documentation, read on 15 November 2026. The VerWatch figures cover every package in the Craft projects VerWatch tracked that day. If something here has changed, tell us and we'll correct it.
More comparisons
- VerWatch vs Dependabot for Craft CMS
- VerWatch vs Renovate for Craft CMS
- VerWatch vs Snyk for Craft CMS
Or see how VerWatch works and sign in with GitHub to connect your Craft repositories. It's free while VerWatch is in beta.